Flow Batteries Europe · Policy toolbox

A Toolbox for energy independence

Ten instruments for Europe’s next-generation batteries.

  • Energy security
  • Industrial competitiveness
  • Affordable energy
  • From ambition to deployment

Take part

Back the toolbox

Add your support to our call on Commissioner Jørgensen to put these ten tools to work.







    “We need all the tools in the toolbox” to succeed in the energy transition.

    At his hearing on 5 November 2024, Commissioner Dan Jørgensen explicitly included new energy storage technologies among those tools.

    Today, we offer a toolbox to ensure next-generation batteries help turn that commitment into greater European energy independence and industrial competitiveness.

    Lithium-free next-generation batteries such as flow batteries often boast specific features:

    No fire risk
    Low maintenance
    Long lifetime
    Heavy cycling without degradation

    These strengths make them particularly relevant to strategic applications, from defence facilities and energy-intensive industries such as metallurgy to AI data centres, where durability and dependable electricity are essential.

    Europe already has companies and industrial capabilities developing these solutions. Scaling their manufacturing and deployment here can strengthen energy security while boosting European competitiveness.

    This toolbox sets out 10 policy actions needed to make that happen, from research to manufacturing and commercial deployment.

    We call on Commissioner Jørgensen to consider all the tools in this toolbox and put them to work to ensure Europe’s success.

    The ten tools

    Open the toolbox

    Ten policy actions, from research to manufacturing and commercial deployment. Open the case and pick a tool to see the challenge, the action we ask for and why it matters.

    Click the case to open it

    Loading the 3D toolbox

    All ten actions as text

    01InnovateSustain innovation

    Sustain innovation across Europe’s battery technologies

    €925 millionearmarked for BATT4EU, 2021–2027

    Challenge

    Different electricity-system needs require different combinations of storage duration, cycling, safety, efficiency and cost. Europe’s innovation programmes must support that diversity.

    Requested action

    Maintain a dedicated Batteries Partnership in the next EU research programme, with sustained support for stationary applications. Support advances in organic, iron-chromium and other flow-battery chemistries, alongside improvements to existing commercial technologies, with funding matched to technological maturity.

    Why it matters

    Europe must develop the technologies its future electricity system needs. With €925 million earmarked for BATT4EU in 2021–2027, the EU has already made a substantial investment in battery research. Sustained support across different chemistries would build on that investment, strengthen European intellectual property and industrial capabilities, and create more options to meet storage needs while diversifying material supplies.

    02BridgeConnect research to deployment

    Connect research funding to commercial deployment

    €17 billionHorizon 2020 “industrial leadership” priority audited by the European Court of Auditors

    Challenge

    Research grants and commercial project finance serve different stages. The industrial demonstration and initial deployments needed between them can remain unfunded.

    Requested action

    Establish clear routes from research programmes into demonstration, initial commercial deployment and replication funding. Support projects with industrial customers, utilities and infrastructure operators, including independent performance monitoring where needed to enable subsequent investment.

    Why it matters

    Europe needs its research investment to deliver commercial products and industrial growth. In its 15 October 2026 audit of Horizon 2020’s €17 billion “industrial leadership” priority, the European Court of Auditors found insufficient emphasis on commercialisation and scale-up, alongside weak monitoring of lasting economic results. Battery funding must connect successful research to real customers, commercial orders and manufacturing investment in Europe. Success should be measured through market uptake and industrial growth as well as research results.

    03EnableEnable support to next-generation stationary battery industry

    Back Europe’s next-generation stationary battery industry

    10 GWhminimum planned annual capacity required by the Battery Booster Facility

    Challenge

    EU battery support is too often built around EV batteries and lithium-ion production models. This leaves next-generation stationary technologies, including flow batteries, outside key measures, holding back the scale-up and deployment of an industry that already exists in Europe.

    Requested action

    Make next-generation stationary batteries eligible for relevant EU funding and industrial support. Review funding programmes, procurement criteria and regulatory requirements to remove inappropriate EV-oriented rules and production thresholds. Assess technologies through duration, cycling, lifetime costs and safety, while accommodating different manufacturing models and applying proportionate requirements.

    Why it matters

    The €1.5 billion Battery Booster Facility requires EV-compatible cell production and planned annual manufacturing capacity of at least 10 GWh. The €1 billion IF24 Battery call also targeted EV battery-cell manufacturing. These choices exclude stationary flow-battery manufacturers from important dedicated funding opportunities. Europe already has companies producing flow batteries, electrolytes and components. Its battery policy must help that industry expand and deploy its technologies here.

    04IncentiviseReward useful flexibility

    Create lead markets by rewarding useful flexibility

    12 → 28 GWprojected EU data-centre capacity, 2025 to 2030

    Challenge

    Growing industrial and data-centre electricity demand can intensify grid constraints. Investment decisions need incentives to incorporate flexibility from the outset.

    Requested action

    Create lead markets through public procurement, support schemes and priority grid connection for projects that demonstrably benefit the network. Enable industrial sites, data centres and renewable-energy projects incorporating storage to obtain earlier connections where they provide verifiable flexibility or release capacity for other users.

    Apply transparent criteria based on actual network benefits and enforceable operating commitments.

    Why it matters

    The Commission projects EU data-centre capacity to more than double, from approximately 12 GW in 2025 to 28 GW in 2030. Annual electricity consumption is projected to rise from 68 TWh in 2024 to 114 TWh in 2030. AI workloads can also generate rapid changes in power demand. Storage and enforceable flexibility commitments can help sites connect sooner, manage demand and provide grid services. Rewarding these contributions would support industrial and digital growth, ease network constraints and create a lead market for European storage technologies.

    05SecureSecure critical raw materials

    Secure critical raw materials and put reserves to productive use

    May 2027next review of vanadium’s critical status due

    Challenge

    Concentrated raw-material supplies and price volatility expose Europe’s clean-technology industries to disruption. Securing materials must also support affordable access for European projects.

    Requested action

    Recognise vanadium as a strategic raw material in the forthcoming CRMA review and develop a European Vanadium Facility as one possible component of the European Corporation on Critical Raw Materials announced by President von der Leyen. Vanadium is currently classified as critical, with the next review due by May 2027.

    The Facility would secure vanadium and deploy part of those holdings through leasing arrangements with eligible European projects, retaining ownership and contractual recovery rights. Recovered material could be reconditioned and used in subsequent projects (vanadium electrolyte can be fully recovered as it does not degrade).

    The Facility would be one material-specific instrument within the wider Corporation. Comparable arrangements could support other critical raw materials where appropriate.

    Why it matters

    Europe’s secured raw materials should help European projects get built. Leasing can replace a substantial upfront material purchase with payments over time, reducing initial capital requirements. The Facility would put secured holdings to productive use while retaining ownership and recovery rights over valuable materials. Coupled with European sourcing, refining and electrolyte production, it would lower upfront costs for European projects, strengthen the supply chain and allow recovered material to support successive installations.

    06ScaleScale the industrial supply chain

    Strengthen and scale Europe’s existing industrial supply chain

    Challenge

    Europe already has flow-battery manufacturers, specialist suppliers and upstream projects. Meeting growing demand requires coordinated expansion across these linked activities.

    Requested action

    Support investment across the chain from responsible extraction to recovery from industrial residues, refining, electrolyte production, components, battery manufacturing and production equipment. Combine investment support with working capital, production ramp-up assistance and skills development.

    Why it matters

    Europe already produces flow-battery systems, electrolytes and components such as stacks, tanks and pumps. The industrial base exists; the task is to expand it. Investment across connected activities would help manufacturers secure materials and components, increase output and improve production efficiency. Scaling these capabilities together would turn growing storage demand into European orders, skilled employment and a more resilient supply chain.

    07RewardReward long-duration storage

    Reward the full system value of long-duration storage

    1 h vs 8 ha megawatt for one hour and a megawatt for eight hours meet different needs

    Challenge

    Electricity markets and procurement mechanisms do not consistently reward the added value of storage that can deliver power for longer periods, including during extended renewable shortfalls. Useful system benefits therefore do not always translate into investable revenues.

    Requested action

    Translate assessed flexibility needs into competitive procurement and, where justified, long-term contracts. Recognise duration, availability and repeated delivery in capacity mechanisms and flexibility procurement. Remunerate needed congestion-management, balancing and stability services, with access based on demonstrated technical capability.

    Why it matters

    Security of supply depends on how long power remains available when the system needs it. A megawatt available for one hour and a megawatt available for eight hours meet different needs. Procurement must recognise that difference where sustained delivery is required. Rewarding verified contributions would support investment in storage that enables greater use of renewable electricity, reduces reliance on fossil backup and limits exposure to imported-fuel prices.

    08UnlockRemove duplicate electricity charges

    Remove duplicate electricity charges and open access to markets

    2023the Commission recommended preventing double taxation

    Challenge

    Storage can pay taxes and levies on electricity it subsequently returns to the grid, even though these are also paid by the final consumer. Network fees can also fail to reflect when and where storage reduces grid costs.

    Requested action

    Remove unjustified duplicate taxes and levies on electricity stored and reinjected. Set predictable network fees reflecting storage’s actual impact on network costs. Enable aggregation, proportionate qualification and participation in compatible electricity and flexibility markets, including for industrial-site storage.

    Why it matters

    Charging consumption taxes twice on the same electricity makes useful storage more expensive. The Commission recommended preventing double taxation in 2023; implementation must follow. Cost-reflective network fees would give operators clearer incentives to help the grid, while fair market access would allow businesses to earn from the flexibility they provide. Together, these changes would improve storage economics, support industrial electrification and broaden competition in electricity markets.

    09FinanceFinance long-lived storage

    Provide financing suited to long-lived storage infrastructure

    €500 millionEIB corporate PPA pilot, with extension to storage identified as a possible next step

    Challenge

    Short loan maturities and costly guarantees can increase the cost of infrastructure designed to deliver services over decades.

    Requested action

    Expand EIB and national promotional-bank lending, guarantees and project aggregation for viable stationary-storage investments. Make these instruments accessible across battery chemistries and project sizes, and support storage-backed electricity supply contracts.

    Why it matters

    Financing terms directly affect the cost of deploying storage. In June 2026, the EIB identified extending its €500 million corporate power purchase agreement pilot to storage as a possible next step. Accessible guarantees and lending matched to project lifetimes would help attract private investment and reduce financing costs. Aggregating smaller projects would extend those benefits to more businesses, supporting storage deployment and more predictable electricity supply costs for industrial customers.

    10AccelerateAccelerate procedures for grid-friendly energy storage

    Accelerate storage that reduces congestion and renewable-energy waste

    €7.2 billionrenewable-curtailment-related costs across seven European countries in 2024

    Challenge

    Lengthy permitting and connection queues delay installations that could relieve network constraints and enable more renewable electricity to reach consumers.

    Requested action

    Establish clear, proportionate permitting procedures, transparent connection processes and flexible connection agreements. Assess storage alongside grid reinforcement and other flexibility options, recognising its contribution to reducing congestion, renewable curtailment and overall system costs.

    Why it matters

    Delaying useful flexibility carries a cost. The Commission’s Grids Package impact assessment cites €7.2 billion in renewable-curtailment-related costs across seven European countries in 2024. Well-located and appropriately operated storage can absorb renewable electricity that would otherwise be curtailed and release it when the network can deliver it. Connect storage sooner to use more clean power, relieve congestion and lower system costs.

    Put the tools to work

    Add your name to the call on Commissioner Jørgensen to deploy next-generation batteries in Europe.

    Add your support